Download Print this page

Hayward 3478 PLDBL3 Owner's Manual page 6

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 5
EN
3478
Reference
PLDBL3
Consumption in W
Power supply
No. of LEDs
Lumens
Kelvin
White / RGB
LED Technology
Application
Concrete
Face ring colour
White
Plastic casing
Fastening method
Radio frequency
Radio frequency
remote control
This light comprises one ALP01 light
Energy Efficiency
source of energy class D.
INSTALLATION GUIDE: LED SPOTLIGHT
Description of spotlight and prerequisites for installation:
The spotlight is class III, and IP68 rated at 1m. The bulb has a very low safety supply voltage of 12 VAC or 20 VDC.
The spotlight must point away from the house or patio to prevent intrusive light levels.
The spotlight must be positioned no more than 60 cm below the coping (distance measured from the axis of the bulb). The spotlight niche has two 3/4"
outlets. The outlet at the back is generally used for masonry pools and the lateral outlet for fibreglass or panel pools.
Cable of sufficient length must be left during installation to allow for the bulb to be replaced out of the water at a later date.
MASONRY STRUCTURE WITH LINER:
• Place the protective paper on the front of the
niche.
• Position the spotlight niche, ensuring that the
lateral niche hole is vertical. Seal the niche into
the masonry and apply the finish coating until it
is flush with the front edge of the niche.
• Block the unused exit with the stopper.
• Install the seal on the front of the spotlight
niche.
• Place the seal on the mounting flange for liner
pools.
• Fix the mounting flange for liner pools in place
after installing the liner.
• Cut out the liner.
INSTALLATION OF THE BULB:
• Pass the bulb cable through the bulb housing cable gland. Take care - the 30° bevelled edge of the seal must face the cable gland.
• Feed the bulb cable through the conduit up to the junction box, ensuring the bulb cable passes through the niche cable gland. Take care - the 30°
bevelled edge of the seal must face the cable gland.
• Make the point where the cable passes through the niche cable gland watertight.
• Coil the excess cable around the optical system and hold it in front of the niche.
• Embed the spotlight optical system into the niche by anchoring the wings in the ridges.
TRANSFORMER POWER:
The transformer used must have a secondary output voltage of 12V (12.5V for some models). The power must be appropriate for the power of the
spotlight(s) that will be connected (minimum power = 23VA for a white bulb and 28VA for an RGB bulb).
In all cases, the sum of the spotlight powers must remain less than or equal to the transformer power.
Each spotlight must have a separate protection. 5A and 6A fuses or circuit breakers must be used to provide protection on the secondary circuit of the
transformer (see diagram below).
3481
3481
3481
PLDBL3
PLDBL3DGR
PLDBL3LG
13 W
60
1450
6500
Cool white
CrystaLogic
Liner / Fibreglass
White
Dark grey
Light grey
No
D
-
ALP01
FIBREGLASS/PANEL STRUCTURE
WITH LINER:
• Use the template to drill through the fibreglass/
panel.
• Insert the spotlight niche from inside the pool.
Install the foam, then screw the niche to the
fibreglass or panel, ensuring that the ridges on
the niche are horizontal.
• Waterproof the fibreglass/liner and the cable
conduit and install the spotlight optical system
as described for a masonry structure with liner.
Only use Hayward ® spare parts
3481
3478
3481
PLDBL3SA
LDRGB3
LDRGB3
12 VAC / 20 VDC
Concrete
Sand
White
Niche + ABS Ring = Cofies
Clip
A
G
A
D
The regulations EU2019/2015 and EU2019/2020 do not apply to this
RGB light.
G
6
3481
3481
LDRGB3DGR
LDRGB3LG
16 W
90
600
-
RGB
ColorLogic
Liner / Fibreglass
White
Dark grey
Light grey
Yes
No
MASONRY STRUCTURE WITHOUT
LINER:
• Seal the spotlight niche into the masonry,
ensuring that the front part of the niche is set
back so that the finish coating or tiling can be
installed.
• Waterproof the cable conduit and install the
spotlight optical system as described for a
masonry structure with liner.
3481
LDRGB3SA
Sand

Advertisement

loading