Before you begin
Pre-Installation Checklist
Pool is less than 25,000 gallons
There is at least 10 inches of straight pipe in the return piping after all installed equipment (and
the pipe is at least 2 inches off of the ground) to install the Cell Vessel
The Control Box will be mounted within 3ft of a 120v GFCI outlet
The Control Box will be mounted within 15ft of the installed Cell Vessel
The Control Box will be installed at least 10 feet away from the pool.
Pool plumbing is 1½" or 2" PVC (If black polyethylene pipe is used, see manual)
You have a saw suitable for cutting PVC
You have tools for mounting the Control Box (drill, drill bits, screwdriver)
You have a permanent marker to mark the PVC pipe
You have balanced your pool chemistry and have 3200ppm salt in your pool (see Chemistry
Quickstart Guide)
Installation Preparation
Read this entire Quickstart Guide
Remove power to filter pump
Drain water from pool piping
Verify that all parts are included in the box
You are wearing safety glasses and have read the safety precautions in the owner's manual
Overview
WWW.HAYWARD.COM 855-429-9274
Installation Quick Start Guide
Salt & Swim
TM
Spread out parts on ground
Cell Vessel
Cutting Template
1½" Nut Assembly (2)
Collar
2" Nut Assembly (2)
STEP 1:
Mount the Control Box to a wall or post within 3 feet of a GFCI outlet, making sure that the cord will
reach. The Control Box will also have to be mounted within 15 feet of the Cell Vessel as shown in the
Overview.
Use the included Mounting Template to help locate the mounting holes and fasten the Control Box to the
intended surface.
Strap Wrench
Grease
Retaining Nut
Gasket (2)
Compression
Ring
Cell Vessel
Mount Control Box
Control Box
Mounting
Template
Screws
Cell Cap & Cord
Cell
Control Box
Turn Over
Need help?
Do you have a question about the Salt & Swim and is the answer not in the manual?
Questions and answers