Chapter Overview - Filtec FT-50c Service And Technical Reference Manual

Fill level inspector
Table of Contents

Advertisement

Chapter Overview

Industrial Dynamics Company, Ltd. Document 40255-0600
Before you can use your FT-50 Inspection System you must
configure the FT-50 and the rejector to operate on your production
line. There are two parts to configuring the inspection system:
• Mechanical Configuration consists of physically adjusting and
aligning the FT-50 sensors and the rejector.
• Software Configuration consists of activating and setting all
operational parameters for the inspection functions.
The following flow chart explains the configuration order.
Perform fill level
optimization, if need.
Your FT-50 may not
contain these options.
These procedures apply
only if your FT-50 is so
equipped.
Figure 4-1. FT-50 Inspection System Configuration Flow Chart.
Chapter 4: Configuring the FT-50 for Operation
Adjust head height for
fill level inspection.
Adjust inspection
trigger height.
Calibrate encoder
(if applicable) and
rejector timing.
Determine the inspection
looktime gate.
Determine the
gamma threshold.
Adjust bulged
end sensor.
Adjust missing lid sensor.
Adjust dud detection
sensor.
Adjust down can sensor.
Configure external
reject function.
Configure bulged
end function.
Configure missing lid
function.
Configure dud
detection function.
Configure down can
function.
4-3

Advertisement

Table of Contents
loading

Table of Contents