FT-50 Fill Level Inspector Service Manual
Mounting the FT-50
Note
3-8
Assemble the Floor Stand
The parts included for your installation are based on the instal-
lation height information you specified when you ordered your
FT-50. If you cannot mount the FT-50 as originally planned, or if
parts are missing, contact IDC Customer Service immediately.
There are three mounting configurations:
• Low Mount: for installations below 33 inches (846 mm).
• Standard Mount: for installation heights between 33 and 60
inches (846 mm -1538 mm).
• High Mount: for installations above 60 inches (1538 mm).
1. Use the following equation to determine the proper length for
the vertical support pipe.
L
p
L
The length to which the pipe must be cut.
p
H
The distance from the top of the conveyor chain to the floor.
C
– 11
Subtract 11 inches (279 mm)
H
The fill level of the liquid in the container. If you use this unit to
L
inspect multiple containers with different fill levels, use the
following equation to determine this value.
H
H
= Height of lowest fill level
1
H
= Height of highest fill level
2
Double check your calculations before cutting the pipe. If you cut it
incorrectly, you can not complete the installation until you obtain a
replacement pipe.
Industrial Dynamics Company, Ltd. Document 40255-0600
=
H
+
H
11
–
L
C
H
–
H
2
1
=
H
+
------------------- -
L
1
2