Maintenance Manual
Annual Maintenance Procedures
SX-135 XC models:
Note: Properly adjusted extend/retract cables will
maintain a relationship of the gap between boom
tubes #2 and #3.
1
Start the engine from the ground controls.
2
Fully raise the boom then extend the boom
approximately 15 ft / 4.6 m.
3
Fully retract the boom and lower to the
horizontal position.
4
Stop the engine.
5
Measure and record the distance between
boom tubes #1 and #2, measuring from the
points identified as (4) and (5) in the
illustration. This is dimension "A".
1 Boom tube #1
2 Boom tube #2
3 Boom tube #3
4 Boom #1 measuring surface
5 Boom #2 measuring edge
6 Boom #2 measuring surface
7 Boom #3 measuring edge
118
6
Measure the distance between boom tubes #2
and #3 using points (6) and (7) in the
illustration. The gap should be
1 in / 2.6 cm to 1.5 in /3.9 cm greater than
dimension "A".
Note: As an example, if the dimension "A" is 1.25 in
/ 3.2 cm, then the gap between boom tubes #2 and
#3 should be between 2.25 in / 5.7 cm and 2.75 in /
7.1 cm.
Result: The distance between boom tubes #2
and #3 is 1 in / 2.6 cm to 1.5 in /3.9 cm greater
than dimension A. The boom tube is in
tolerance.
Result: The distance between boom tubes #2
and #3 is less then 1 in / 2.6 cm or more than
1.5 in / 3.8 cm greater than dimension "A". The
boom tubes need to be adjusted. Refer to
Repair Procedure in the appropriate Service
and Repair Manual for your machine, How to
Adjust the Boom Extend/Retract Cables.
S
®
Booms • Z
®
Booms
April 2018
Part No. 1268489GT