SolarEdge SE3K-RWB Installation Manual page 65

Table of Contents

Advertisement

64
  Status Screens - Operational Mode
LOCAL - The power is controlled locally (e.g. by a fixed limit), or this inverter limits
the PV power production to its relative portion of the feed-in power limit, as a
result of disconnected communication with the smart energy manager. If this
status appears, check the communication to the smart energy manager or the
communication to the meter.
PWR Limit: The inverter maximum output power set by one of the power limiting
options:
RRCR
Smart energy manager (Feed-in limitation)
P(f)
P(U)
Q(U)
Cos Phi: The ratio between active to reactive power
Power Prod: The power produced by the inverter
For more information, refer to the Power Control Application Note ,
available on the SolarEdge website at
http://www.solaredge.com/files/pdfs/application_note_power_control_
configuration.pdf.
B U I   S N : s e r i a l #
 
S t a t e : O n -
g r i d / B a c k u p / M a n u a l
B y p a s s F a u l t < e r r o r c o d e >
 
C o m m u n i c a t i o n O k / N o t O k
L i n e i m b a l a n c e :   X . X X k W
Three Phase System MAN-01-00507-4.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se4k-rwbSe5k-rwb02-70000402-70000502-700006

Table of Contents