SolarEdge SE3K-RWB Installation Manual page 12

Table of Contents

Advertisement

WARNING!
For inverters with manual Rapid Shutdown (PVRSS) functionality - Upon
PVRSS, the internal circuitry remains up, therefore the inverter cover must
be opened only after shutting off the inverter ON/OFF switch. This disables
the DC voltage inside the inverter. Wait five minutes before opening the
cover. Otherwise, there is a risk of electric shock from energy stored in the
capacitors.
LCD panel: displays inverter information and configuration parameters
LCD LEDs: Three LEDs indicate the following inverter statuses:
Color
Green
Power production
Yellow
communication and
inverter shutdown
Red
All LEDs turn on while the inverter is being configured.
 
Three Phase System MAN-01-00507-4.2
Description
On - The inverter is producing power.
Blinking - Standby mode. The inverter is in
Standby mode until its working voltage is reached.
The inverter then enters Production mode and
produces power.
Off - The inverter is not producing power. This
may be during Night mode, when the inverter
ON/OFF switch is OFF or when an error occurs.
Blinking:
Module
Monitoring information is being received from a
power optimizer.
The inverter is being shut down.
On - There is an error. Refer to Errors and
Fault
Troubleshooting on page 78 for more information.
Blinking - The inverter is being shut down.
HANDLING AND SAFETY INSTRUCTIONS