AC grounding to bus bar instead of terminal block - updated instructions and
Connection Unit model images
String fusing requirement note updated: Fuses needed for 4 strings or more
(instead of 3).
Added conduit sealing requirement
In Commissioning chapter:
Updated the activation sequence
Updated menu information descriptions
Removed RS232 reference
In Configuration Menu Options:
Communication section:
Removed RS232 Conf
Added GSM Conf
Power Control section:
Removed Phase Balance link and info
Add link to P(Q) diagram application note
Maintenance section:
Added links to application notes (Upgrading the inverter using SD card;
Isolation fault troubleshooting; Arc fault detection)
Removed Optimizer Conf
Status Screens updates:
Meter status screen - added Power and Energy lines
Telemetry status screen - updated
GSM status screen - new
Communication options - updated
Inverter cover removal sequence - updated
RS485-E option - new
Added link to Arc Detection application note
Troubleshooting:
Error codes moved to a separate document. A link was added to the manual.
Slave Detect and Slave List - updated
Three Phase System MAN-01-00507-4.2
Revision History