Haier AP88NACBEA Operation Manual page 28

Cabinet unit
Hide thumbs Also See for AP88NACBEA:
Table of Contents

Advertisement

Installation procedure
Matters needing attention
Never use oxygen,flamable and poisonous gases for the leak test.
Indoor
Tightly
closed
Tightly
closed
Indoor unit
Detailed diagram of the
three-way valve
To the gauge
distributor
(Liquid side)access hole
(Liquid side)three-way valve
Step 1:Charge for more than 3 minutes under 0.3MPa(3.0kg/cm
Step 2:Charge for more than 3 minutes under 1.5MPa(15kg/cm
--Serious leakage may be found.
Step 3:Charge for more than 24 hours under 3.0MPa(3.0kg/cm
--Small leakage may be found.
Check for pressure decrease
Without pressure decrease-Pass
With pressure decrease-Check for leaage.
There will be a 0.01MPa(0.1kg/cm
the 24-hour pressure charge.It should be corrected during the test.
Outdoor
Solder joint
Solder joint
Tightly
Solder joint
closed
(Gas side )access hole
(Gas side)three-way valve
Field tube
Field tube
installation
installation
g) pressure change for every 1 C ambient temperature change during
2
Low-pressure
gauge
Three-way valve fully
closed(gas side)
Access hole
Access hole
Outdoor unit
Three-way valve fully closed
liquid side
To the unit
g)
2
g)
2
g)
2
27
Outdoor unit
High-pressure
gauge
VL VH
Gauge distributor
6.4
Copper
pipe
Relief valve
6.4
Copper pipe