Section 3: Operation; Light Tower Setup - Generac Power Systems MLT6SC Owner's Manual

Light tower
Hide thumbs Also See for MLT6SC:
Table of Contents

Advertisement

Section 3: Operation

Light Tower Setup

E
A
DANGER
High Voltage. Verify area above unit is clear
of overhead wires and obstructions. Contact
with high-voltage power lines will result in
death or serious injury.
WARNING
Do not set up the unit if high winds
> 60 mph
> 60 mph
are expected. High winds can cause the
unit to tip or fall, causing severe injury
or machine damage.
1. For maximum light coverage, position the unit at
ground level or in a spot higher than the area being
illuminated by the lamps.
NOTE: The mast extends up to 23 ft (7 m).
Owner's Manual for MLT6SC Light Tower
Figure 3-1. Set Up Outriggers and Jacks
(000260a)
(000297)
C
D
B
1"
G
2. See
Figure
3-1. Place the unit on firm ground that
is relatively flat (less than 5° slope), and block the
wheels to keep it from moving. This will make it
easier to level the unit.
3. Pull the locking pin (A) on the tongue jack (E) and
rotate the jack 90°. Install the locking pin. Rotate
the jack handle clockwise to raise the trailer tongue
off the towing vehicle.
4. A grounding stud (B) is located on the rear frame of
the trailer near the left side outrigger. For ground-
ing requirements, follow local, state, and National
Electrical Code (NEC) regulations.
5. See Details C–D. Pull the locking pins (C) on the
outriggers (D) and pull each outrigger out until the
spring loaded locking pin snaps back into place.
Pull the locking pin on each outrigger jack (F) and
rotate each jack 180° until the jack pad is facing
down. Install the locking pin.
Operation
DETAIL B
DETAIL C
F
DETAIL D
DETAIL E
006454
25

Advertisement

Table of Contents
loading

Table of Contents