ADC DSX-3 User Manual page 28

Rear cross connect system
Hide thumbs Also See for DSX-3:
Table of Contents

Advertisement

ADCP-80-314 • Issue 6 • January 2001 • Section 2: Installation
When bringing the cables into the bay, make sure that all cables carrying digital signals away
from the bay are run vertically along the right side of the bay (as viewed from the front), and
all cables carrying signals to the bay are run vertically along the left side. The cables should
be run in the rack duct and attached to appropriate cable tie brackets in the duct using nylon
tie-wraps or cable lacing. Any cables not contained in the duct should be secured to the cable
brackets on the rear of the bay. If the cables are coming into the bay from above, cable
attachment should start at the bottom and work up (refer to
If the cables are coming in from below, cable attachment should start at the top and work
down (refer to
Page 2-6
 2001, ADC Telecommunications, Inc.
Figure 2-3. Cable Routing from Top to Bottom
Figure
2-4).
Figure
SPACER
OR
FILLER KIT
2-3).
NETWORK
ELEMENT
CABLES
8656-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsx-4-24

Table of Contents