RavenC160-180.FB 2 Wed Jul 10 14:00:20 1996
Preparing Your Workstation
Preparing Your Workstation
1 Determine the workstations LAN ID by entering the following at the prompt:
/usr/sbin/lanscan
The output is similar to the following:
Hardware Station
Path
Address
2.0.2
0x08000970ECC0 0
After you install the new CPU board or I/O board and power on the system for
the first time, you are prompted for the LAN ID. Record the information here so
you have a record of it:
EtherLAN ID ___________________-___________________
You must supply the dash (-) between the first six digits and the last six digits.
2 Power off your workstation by pressing the power button on the front panel.
When you press the power button, the workstation automatically shuts down the
operating system before it powers off the system.
3 When the workstation has completed shutting down and powering off, power off
the monitor, and any peripheral devices connected to the workstation.
4 Unplug the power cord of the system unit, the monitor, and any peripheral devic-
es from ac wall outlets.
2
Dev Hardware Net-Interface
lu
State
NameUnit State ID
UP
lan0
UP
NM
Encapsulation Mjr
Methods
Num
4
ETHER
52
Need help?
Do you have a question about the Visualize c160 and is the answer not in the manual?
Questions and answers