Riello DB 6 LSM C13 Installation, Use And Maintenance Instructions page 71

Dual fuel light oil/gas burner type 14304y
Table of Contents

Advertisement

Available languages

Available languages

4.15.3 Wiring diagram (SQM 40)
2/
8
6)

2
&8
**
2-
*
:

:6*
:6
*
Fig. 31
84
845
**
**
9$
9%
:6
*
Key (Fig. 31)
ASZ
Servomotor potentiometer (optional)
XT1
Burner terminal strip
PA
Air pressure switch
PGM
Max. gas pressure switch
PO
Maximum oil pressure switch
SM
Servomotor
TA
Ignition transformer
XTB
Burner earth
2)
2

2
2
**
**
2
2
:"

9
9
78


#
#
9&
Installation

:#


2-
9
9
5
53"

$
"
#
:5
*
"
%
:2
9'
UV
UV sensor
VF
Operation valve
VP1-2
Gas pilot safety valve
VR
Oil return valve
VRS
Oil return valve
VS
Oil safety valve
X1-X2-X3
Servomotor terminal board
XS1-XP1
Servomotor connection plug-socket
After carrying out maintenance, cleaning or
checking operations, refit the cover and all the
safety and protection devices of the burner.
28
GB
82
82
**
**
**
:$

2-
9"
9
:
:

"
#

#
8.
85
**
9#
)5
=
>
?
:

$ 
2-
20114504

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

20114304

Table of Contents