Installer Maintenance; Check The Heat Exchanger - Lindab RHR-CF Installation Manual

Hide thumbs Also See for RHR-CF:
Table of Contents

Advertisement

Installation instructions

20.2 Installer maintenance

The following maintenance interventions must only be
carried out by the installer or by qualified personnel:
• Inspect the filters and clean them if necessary;
• Inspect the heat exchanger and clean it if necessary;
• Inspect the fans and clean them if necessary;
• Check the condensate drain once every two years.
The following paragraph gives a short description of the
maintenance interventions.
PLEASE NOTE: If maintenance is not carried out
regularly, the ventilation system might not work properly.

20.3 Check the heat exchanger

Check the heat exchanger once every two years.
Always disconnect power before accessing the
unit.
• Open the front panel
• Unscrew the front panel and remove it.
Fig. 80
52
1
2
Lindab reserves the right to make changes without prior notice
2022-01-28
li n d a b | w e s i m p l i fy c o n s t r u c t ion
Fig. 81
1
2
RHR-CF

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhr-ehRhr-hsRhr-cf-vRhr-cf-hRhr-feetRhr-f7m5 ... Show all

Table of Contents