4.1 PREPARING FOR WORK BEFORE THE FIRST USE

4.1.1 CHECKING THE TRAILER AFTER DELIVERY

The manufacturer guarantees that the trailer is fully operational and has been checked
according to quality control procedures and is ready for use. This does not release the user
from an obligation to check the machine's condition after delivery and before first use. The
machine is delivered to the user completely assembled.
Before commencing work, machine operator must inspect the technical condition of the trailer
and prepare it for the first start-up. The user must carefully read this Operator's Manual and
observe all recommendations, understand the design and the principle of machine operation.
ATTENTION
Before hitching to tractor and using the trailer, the user must carefully read this
Operator's Manual and observe all recommendations.
External inspection
Check completeness of machine (standard and optional equipment).
Check condition of protective paint coat,
Inspect trailer's individual components for mechanical damage resulting from
incorrect transport (dents, piercing, bent or broken components).
Check technical condition of tyres and tyre pressure.
Check technical condition of elastic hydraulic conduits.
Check technical condition of pneumatic conduits.
Check that there are no hydraulic oil leaks.
Check electric lamps.
Check hydraulic cylinders for leaks of hydraulic oil.