Summary of Contents for QTech QSW-6900-56LF Series

  • Page 1 Installation Manual 0. Preface QSW-6900-56LF Series Switches Hardware Installation and Reference Guide QSW-6900-56LF www.qtech.ru...
  • Page 2 QTECH reserves all copyrights of this document. Any reproduction, excerption, backup, modification, transmission, translation or commercial use of this document or any portion of this document, in any form or by any means, without the prior written consent of QTECH is prohibited.
  • Page 3 At the same time, it is assumed that the users of this switch are already familiar with the related terms and concepts of Ethernet. Obtaining Technical Assistance ❖ QTECH Website: https://www.qtech.ru ❖ Technical Support Website: https://helpdesk.qtech.ru...
  • Page 4: Product Overview

    10G/100G access, low latency, and complete data center features. QSW-6900-56LF switches, with up to 48 10G ports and 8 100G ports, can be used to compose a high-performance and high- reliability data center network. The QSW-6900-56LF Series Switches: Model 100G...
  • Page 5 Input current range: 3.6A Frequency: 50/60 Hz Rated current: 3.5A to 7.2A Power Less than 300 W Consumption Optical Module The supported modules update at any time, contact QTECH for details. SFP+ Port Supported QSFP28 Port Supported FC Port Unsupported...
  • Page 6 It is recommended users configure all fans redundancy. Figure 1-1 Appearance of the QSW-6900-56LF Front Panel Figure 1-2 Front Panel of the QSW-6900-56LF 4. SFP+ port status indicator 1. Switch status indicator Notes: 5. QSFP28 port 2. Switch locator indicator www.qtech.ru...
  • Page 7 ❖ Universal serial bus (USB) port: This port can connect with USB memory to save logs, host versions, warnings and other diagnostic messages. Therefore, it is more convenient to upgrade the software version of the switch on line and save the log information. www.qtech.ru...
  • Page 8 At the same time, the local USB port is compatible with most of the USB controllers except some USB flash disks. QSW-6900-56LF series switches support debugging, configuration, maintenan management and host software uploading of Console ports. ❖ Console port: Use RS-232 interface electrical level and standard RJ45 connector. This interface is connected with the serial port of terminal PC to perform system debugging, configuration, maintenance, management, and host software uploading.
  • Page 9 The power supply module supports hot swapping. The QSW-6900-56LF series switches support 1+1 power supply redundancy. To improve the stability and reliability of the entire system, it is recommended to configure 1+1 power supply redundancy.
  • Page 10 It requires at least three fan modules to work normally. Filler panels need to be installed in the unoccupied fan module slots to ensure ventilation and heat dissipation and avoid dusts. Power modules and fan modules with different air direction cannot be used together. www.qtech.ru...
  • Page 11: Preparation Before Installation

    ❖ Do not place the device in a damp location. Do not let any liquid enter the chassis. Any nonstandard and inaccurate electrical operation can cause accidents such as fires or electrical attacks, thus causing severe, or even fatal damages to human bodies and the devices. www.qtech.ru...
  • Page 12: Installation Site Requirements

    Make sure the cabinet complies with the following conditions if the QSW-6900-56LF is installed in the cabinet: ❖ Install the switch in an open cabinet as much as possible. If you install the switch inside a closed cabinet, be sure that the cabinet has a good ventilation and heat dissipation system. www.qtech.ru...
  • Page 13 ❖ The cabinet should be properly grounded. 2.2.2 Ventilation Requirements For the QSW-6900-56LF series products, leave sufficient space in the front and at the back of the chassis (at least 20cm) for ventilation. After various cables are connected, bundle the cables or place them in the cable management bracket to avoid blocking air inlets.
  • Page 14 The lightning protection system of the facility is an independent system that consists of the lightning rod, down lead conductor and the connector to the grounding system, which usually shares the power reference ground and yellow/green safety cable ground. The lightning discharge ground is for the facility only, not for the device. www.qtech.ru...
  • Page 15 All the above constitute the comprehensive grounding requirements. The grounding resistance should be less than 1Ω. There is one grounding connector at the right bottom of the chassis of QSW-6900-56LF series switches. The grounding connector is pasted with conspicuous warning labels.
  • Page 16: Precaution For Fiber Connection

    Air-laid paper, fiber end microscope Tools Meter Multimeter, errormeter, optic-power meter QSW-6900-56LF series is not shipped with a tool kit. You need to prepare a tool kit by yourself. 2.5 Unpacking and Checking Goods Checklist Chassis Chassis, Yellow/green grounding cables; Quick installation guide; Packing list,...
  • Page 17: Product Installation

    3. Product Installation 3 PRODUCT INSTALLATION QSW-6900-56LF series Ethernet switch must be used and fixed in the room. Make sure you have carefully read part 2, and be sure that the requirements set forth in part 2 have been met.
  • Page 18: Cabinet Installation

    Usually, you should reserve space of at least 10mm between the front panel of the equipment and that of the cabinet after installation. Before mounting into a cabinet, you need to make sure the following conditions are met: www.qtech.ru...
  • Page 19 During the process of installation, keep the front panel of the switch forward. It is recommended use tray to install the QSW-6900-56LF series switches and fix the tray on the bracket, or use the rear bracket provided with the switches.
  • Page 20 The operation is simple as follows: Attach the four rubber pads to the four corners on the switch bottom. Place the switch on the workbench and ensure good ventilation condition around the switch. Figure 3-3 Mounting the Switch on a Workbench www.qtech.ru...
  • Page 21: Installing And Removing A Fan Module

    1. Loosen the captive screws of the fan module with a screwdriver. 2. Hold the handle at the end of the fan module, and withdraw the fan module slowly. 3. Install the fan filler panel and put the removed fan module into its package www.qtech.ru...
  • Page 22 Figure 3-6 Installing a Power Module Insert the power module smoothly. Please pay attention to the direction of the power panel to avoid wrong insertion. www.qtech.ru...
  • Page 23 Figure 3-7 Strap, Ring and Buckles 1. Insert the strap into the hole at the bottom of the ring and lock it into place. If you want to remove the strap, press buckle A and pull the strap out. Figure 3-8 Installing Strap www.qtech.ru...
  • Page 24 2. Install a filler panel in the power module slot and put the removed power module into its package. www.qtech.ru...
  • Page 25 The socket-outlet should be installed at a location near the device easy for operation. During the device installation, always make the ground connected first and disconnected last. The cross-sectional area of protective earthing conductor should be at least 2.5 mm AWG). www.qtech.ru...
  • Page 26: Connecting The External Interface Cables

    3. For the power cables, you should bind them closely along the chassis downward in a straight line wherever possible. 3.11 Installation Verification Verifying the Cabinet ❖ Verify if the external power supply matches the distribution panel of the cabinet. ❖ After equipment is installed, verify if the front/back cabinet doors can be closed. www.qtech.ru...
  • Page 27 AC power or lightening arrester of Ethernet port. Verifying the Power Supply ❖ Verify that the power cables are in good contact and comply with the safety requirements. To avoid body injury and components damage, cut off power supply before checking the installation. www.qtech.ru...
  • Page 28: System Debugging

    8, parity check none, stop bit 1, and flow control none. Details are as follows: Choose Start > Programs > Accessories > Communications > Hyperterminal. Choose Cancel. The Connection Description window appears as shown in Figure 4-2. Figure 4-2 www.qtech.ru...
  • Page 29 After the serial port is selected, please click OK. The Serial Port Parameter Setting window is displayed, as shown in Figure 4-4. Set the baud rate as 9600, data bit as 8, parity check as none, stop bit as 1, and flow control as none. Figure 4-4 www.qtech.ru...
  • Page 30: Power-On Startup

    Checking After Power-on (Recommended) After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up configurations. ❖ Check if printed information appears on the terminal interface. ❖ Check if the device indicator is normal. www.qtech.ru...
  • Page 31: Monitoring And Maintenance

    ❖ The fan in the equipment responsible for heat dissipation is provided with the fault monitoring signals. When the fan fails, a corresponding alarm will occur. ❖ Replace the faulty fan with a qualified one. ❖ Tighten the captive screws of the fan module. www.qtech.ru...
  • Page 32 Replacing Lithium Battery The built-in lithium batteries can support the real time clock of the QSW-6900-56LF series switches without external power supply. Please contact the technical support representatives of QTECH for replacing lithium batteries.
  • Page 33: Troubleshooting

    Check the installation and fastening of the modules Check the indicators on the device and the modules Check the connection of the serial ports and its parameters Check the connection of the fibers or cables of various ports Contact Technical Support of QTECH for hardware problems www.qtech.ru...
  • Page 34: Common Troubleshooting Procedures

    [Troubleshooting] Please contact QTECH Customer Service Department for technical support. Fault 2: The AC power module does not work The indicator on the front panel of host is OFF. The Status indicator of fan module is OFF, and the fan does not work.
  • Page 35 [Troubleshooting] Check whether the module is inserted correctly. If the newly-inserted module still cannot be powered on even though the checking is ok, please contact QTECH Customer Service Department for technical support. Fault 7: The link cannot be set up between fiber interfaces [Fault Description] The system runs normally.
  • Page 36: Appendix A Connectors And Connection Media

    Now that CAT6A unshielded wire or CAT6 wire is applied in the cabling of the equipment room. The cabling must meet TSB-155 requirements. And the recommended cabling rules are as follows: 1) Avoid mixed cabling with other cables, or use metal clapboard in the trunking to isolate different wires. www.qtech.ru...
  • Page 37 Output Transmit Data- Output Transmit Data+ Input Receive Data+ Output Transmit Data- Input Receive Data- 4, 5, 7, 8 Not Used Not Used Figure A-3 shows the feasible connections of the straight-through and crossover twisted pairs of the 100BASE-TX. www.qtech.ru...
  • Page 38 Figure A-3 Connection of the twisted pairs of the 100BASE-TX/10BASE-T Fiber Connection For the fiber ports, select single-mode or multiple-mode fibers for connection according to the fiber module connected. The connection schematic diagram is shown in Figure A-4: Figure A-4 Schematic Diagram for Fiber Connection www.qtech.ru...
  • Page 39: Appendix B Lightning Protection

    LED is Red, if the N line is on the left and the L line is on the right (facing the socket), the arrester PE www.qtech.ru...
  • Page 40 IN, while the adapter cable connected to the switch is connected to the end of OUT) and observe whether the LED on the borad is normal or not. 5. Use the nylon button to bundle the power cables. Figure B-2 Schematic Diagram for the Ethernet port Arrester Installation www.qtech.ru...
  • Page 41 ❖ Incomplete arrester installation. If there is more than one port connected to the peer device on the switch, it entails installation of arresters on all connection ports for the purpose of lightning protection. www.qtech.ru...
  • Page 42: Appendix C Cabling Recommendations In Installation

    ❖ Before cables are bundled, correctly mark labels and stick the labels to cables wherever appropriate. ❖ Cables should be neatly and properly bundled, and no twisting or bending is allowed, as shown in Figure C-1. Figure C-1 Bundling up cables (1) www.qtech.ru...
  • Page 43 ❖ After bundling up cables with buckles, you should cut off the remaining part. The cut should be smooth and trim, without sharp corners, as shown in Figure C-2. Figure C-2 Bundling up cables (2) www.qtech.ru...
  • Page 44 If heat sources cannot be avoided, high-temperature cables should be used. ❖ When using screw threads to fasten cable terminals, the bolt or screw must be tightly fastened, and anti-loosening measures should be taken, as shown in Figure C-4. Figure C-4 Cable fastening www.qtech.ru...
  • Page 45 ❖ Binding by using buckles should be performed according to Table C-1. Cable Bunch Diameter (mm) Binding space (mm) 80-150 10-30 150-200 200-300 ❖ No knot is allowed in cabling or bundling. www.qtech.ru...
  • Page 46 9. Appendix C Cabling Recommendations in Installation For wiring terminal blocks (such as air switches) of the cold pressing terminal type, the metal part of the cold pressing terminal should not be exposed outside the terminal block when assembled www.qtech.ru...
  • Page 47: Appendix D Site Selection

    ❖ Sulfur-containing materials are forbidden. ❖ Pay attention to the location of the air conditioner. Keep the air conditioner from blowing wind straight toward the device or blowing water drops from the window or air vent toward the device. www.qtech.ru...