Installation; Wiring - Vanderbilt ACTpro-1002A Installation And Operating Instructions Manual

Table of Contents

Advertisement

2 Installation

The ACTpro-100 door stations are for indoor installation only and must be installed as permanently
connected equipment.
Reset the ACTpro-100 door station to its factory default condition before installation. To do this, power the
unit up with ALL switches in the OFF position. The unit will beep after 3 seconds. The unit is now
defaulted. Set the DIP switches to the appropriate address.
If using the ACTpro-1002A, Vanderbilt recommend that an external mains disconnect device is fitted
before installation, and you should ensure that the mains supply to the controller is disconnected during
installation.
Mains power should be connected by a licensed electrician in accordance with local/national codes.

2.1 Wiring

A
Door contact
B
Door push button
C
From previous door or controller
D
To next door
E
Break glass monitoring, normally closed
© Vanderbilt 2019
F
Vanderbilt reader wire colour coding
G
Important: Always place varistor across lock terminals.
H
Double pole Break Glass / Emergency Door Release
When the Break Glass is not activated the B/GL input pin is
held low at 0 volts. When the Break Glass device is
activated the B/GL input pin will lose the 0 volts (goes high)
and report a Break Glass event.
J
DIP switches for door station addressing. See DIP switch
addressing on the next page.
6
A-100542-b
15.03.2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

Actpro-100Actpro-120

Table of Contents