Installation - Blodgett 40ES-KLT Series Installation Operation & Maintenance

Short electric tilting floor kettle
Table of Contents

Advertisement

WARNING
INSTALLATION OF THE KETTLE MUST
BE DONE BY PERSONNEL QUALIFIED TO
WORK WITH ELECTRICITY. IMPROPER
INSTALLATION CAN RESULT IN INJURY TO
PERSONNEL AND/OR DAMAGE TO
EQUIPMENT.
WARNING
DO NOT CONNECT ANY PIPING TO THE
PRESSURE RELIEF VALVE. THE VALVE MUST
BE FREE TO VENT STEAM AS NEEDED.
IMPROPER INSTALLATION WILL VOID THE
WARRANTY! THE ELBOW ATTACHED TO
THE SAFETY VALVE MUST
POINT TO THE FLOOR.
DANGER
ELECTRICALLY GROUND THE UNIT AT THE
TERMINAL PROVIDED. FAILURE TO GROUND
UNIT COULD RESULT IN
ELECTROCUTION AND DEATH.
6
OM-40ES-KLT
The kettle is provided with complete internal wiring and is ready for immediate
connection. Wiring diagrams are provided in this manual and on the inside of the
control housing service panel. Any mechanical or electrical changes must be approved
by the Food Service Engineering Department.
The completed unit has been operated at the factory to test all controls and heater
elements.
1.
Set the kettle in place and level it by turning the bullet feet to adjust leg
length. Allow clearance around the unit for cleaning, maintenance and
service.
2.
Confirm that the jacket water level is at the mid point of sight glass. If the
level is low, follow the instructions under "Jacket Filling and Water
Treatment," Page 14.
3.
The open end of the elbow on the outlet of the pressure relief valve must face
downward. If it does not, turn it to the correct position.
4.
Provide electrical power specified on the equipment electrical information
plate. Observe local codes an/or The National Electrical Code in accordance
with ANSI/NFPA 70 - (current edition.).
5.
The equipment is shipped ready for three phase operation. Refer to the wiring
diagram for single phase operation.
6.
Bringing the electrical service through the entrance at the rear of the support
housing with one inch conduit, making a watertight connection with the
incoming lines. Observe local codes and/or the National Electrical Code
in compliance with ANSI/NFPA 70 (latest edition). When there is a choice
between applicable codes, we recommend following the more stringent
code. (A BX connection is not recommended.)
7.
Electrically ground the unit at the terminal provided.
8.
Check the following to confirm that your kettle is properly installed:
Room for cleaning and servicing
The kettle is level
The correct amount of water is in the kettle jacket
Pressure relief valve is pointed down
Unit is connected with a waterproof supply of the proper voltage, phase
and amperage rating
Voltage
208V
240V
480V
400V
* All at 3-phase. Single-phase also available.

Installation

ELECTRICAL SPECIFICATIONS*
kW
21
24
24
24
Amperes
59
61
29
35

Advertisement