Installation - Blodgett KPT-DS Series Installation Operation & Maintenance

Direct steam tilting floor kettle
Table of Contents

Advertisement

WARNING
THIS UNIT MUST BE INSTALLED BY
PERSONNEL QUALIFIED TO WORK WITH
PLUMBING. IMPROPER INSTALLATION CAN
CAUSE INJURY TO PERSONNEL AND/OR
DAMAGE TO EQUIPMENT.
For proper sanitation, a continuous seal
is required between pedestals or flanges
and the mounting surface.
Cold water cooling option.
All Models
1.
Installation under a ventilation hood is recommended. Consult local codes.
2.
Install and anchor the kettle on a level surface.
3.
If the steam supply pressure is greater than the maximum working pressure
stamped on the nameplate, you must install a pressure reducing valve in the
steam supply line near the kettle.
4.
Connect the steam supply line to the steam inlet fitting. Include a steam control
valve and an appropriate safety valve. To obtain the full heating capability of the
kettle, the steam supply line must be as large as the steam inlet fitting.
5.
The safety valve is preset to relieve jacket pressure that exceeds its rated limit.
Do not try to adjust the valve setting, and do not allow the valve outlet or lever to
be blocked.
6.
Connect the kettle condensate return line to the boiler return line, or to a drain. A
suitable steam trap, strainer, and check valve must be installed.
7.
Any mechanical change must be approved by the Food Service Engineering
Department.
Floor-Mounted Models
1.
Install the unit on a level surface. Ensure that there is adequate clearance at the
sides and rear, as required by the specification drawings. Anchor the pedestal or
legs securely to the floor.
2.
Apply a continuous bead of clear silicone sealant (No. 732 or equivalent) to the
junction between the pedestal or leg flange and the surface, as shown in the
illustration at left. Fill all cracks and crevices, and wipe excess away.

Installation

OM-KPT/KLT-DS
7

Advertisement

Table of Contents
loading

Table of Contents