B680H Automated System; Technical Specifications; Summary Table; Key Fig.5 - FAAC B680 Manual

Hide thumbs Also See for B680:
Table of Contents

Advertisement

The automated system consists of a white aluminium beam with
reflectors, optional signalling lights, a covering compartment and steel
upright profile. Inside the compartment there is an operator consisting
of the upright profile with a hydraulic unit and two plunging pistons
fixed to it, which, by means of a rocker arm, rotate the beam. The
latter remains balanced thanks to a balance spring fitted on one of the
two plunging pistons. The electronic control equipment is also housed
on the upright, inside a compartment, and the whole is protected by
the external covering compartment.
The system features an adjustable electronic anti-crushing safety,
a device that guarantees stopping and locking of the beam in
any position, and a convenient manual release for use in case of
black-out or inefficiency.

1. TECHNICAL SPECIFICATIONS

1.1 Summary table

Power supply (V ~ / Hz)
Electric Motor
Absorbed power (W)
Absorbed current (A)
Motor rotation speed (RPM)
Pump capacity
Yielded torque (Nm)
Oil type
Oil quantity (L)
Anti-crushing System
Deceleration type
Operating ambient temperature (°C)
Rated Operating Time (ROT)
Compartment protection treatment
Beam type
Protection Class
Compartment Dimensions
(LxHxP) (mm)
Weight (body + compartment) (kg)
Opening and closing time (s),
including deceleration

1.2 Key Fig.5

Built-in fl ashing lamp
Electronic control equipment
Oil fi lling cap
Right piston bleeder screw
Hydraulic unit
Right plunging piston
Unit cooling fan
Right feed tube

1.3 Key Fig.6

Bearing structure
Mechanical stops
Rocker arm
Drive shaft

2. ELECTRICAL PREPARATIONS (standard system)

See details in the illustration Fig. 7.

B680H AUTOMATED SYSTEM

100-240 V ~ / 50-60Hz
36Vdc Brushless
240
1,1A at 230 V ~
1000-6000
3,2 l/min (max)
0-370
FAAC HP OIL
~ 1,2
Electronic with absolute encoder
Electronic with absolute encoder
-20 / +55
Continuous Duty at +55°C
EP SL LF PRIMER
Rounded with lights and rubber bumper
IP56
See illustration Fig. 8
65 + 20 / 85 (total)
1.5 - 2 m beam
6 opening / 9 closing - 8 m beam
Left feed tube
Release lock
Left plunging piston
Left piston bleeder screw
Covering compartment
Encoder
Box connecting the main power supply
Switching power supply
Securing plate
Spring guide
Balance spring
Preload adjustment ring nut

3. BARRIER DIMENSIONS

All the dimensions contained in this manual are
expressed in mm
For barrier dimensions, refer to Fig. 8. The covering compartment is
the same for both models, while the bar dimensions differ as shown
in detail at
(bar S) and

4. INSTALLING THE AUTOMATED SYSTEM

4.1 Preliminary checks

For the safety and correct operation of the automated system, ensure
that the following conditions are met:
When in motion, the beam must not encounter obstacles or fl ying
power cables.
The characteristics of the ground must guarantee suffi cient solidity
of the foundation plinth.
No tubes or electrical cables should be present in the plinth
digging area.
If the barrier body is exposed to vehicle transit, provide for
adequate protection against accidental impact, when possible.
Ensure that there is an effi cient earth plate for connecting the
upright profi le.
Wall in the foundation plate so as to allow easy access to
the barrier door. The foundation plinth must be installed
keeping in mind the characteristics of the ground to
ensure perfect stability of the automated system.

4.2 Walling in the foundation plate

Assemble the foundation plate as shown in Fig. 9 ref.
Set the foundation plinth as shown in Fig. 9 ref.
Wall in the foundation plate as shown in Fig. 9 ref.
for one or more sheaths for the passage of the electrical cables.
For dimensional reasons, the cable passage sheaths
must be placed on one side of the space provided at
the base of the barrier (see Fig. 9).
Use a level to ensure that the plate is perfectly horizontal.
Wait for the cement to set.

4.3 Electrical preparations

Following the instructions shown in Fig. 7, prepare the ducts to
make all the control board electrical connections with the chosen
accessories.
Always separate the power cables from the control and safety cables
(button, receiver, photocells, etc.).
Use the cable diameters shown in Fig. 7 and referred to in the
following key:
Barrier mod. B680H
Photocells
Key button

4.4 Mechanical installation

Fix the upright profile onto the foundation plate using the four
provided nuts (Fig. 11). Remember that the hydraulic unit must
usually face the inside of the property.
Prepare the operator for manual operation, as shown in
paragraph 6 / Fig. 18 (Manual Operation).
Remove and set aside the venting screw, as shown in Fig. 12
ref.
.
Set the rocker arm horizontally, then remove, as shown in Fig.
13 ref.
, the upper fixing pin of the piston on the bar side and
insert on it the spring guide and balance spring, as shown in Fig.
14, followed by the preload adjustment ring nut, paying attention
to the direction it must be inserted in (see Fig. 14 ref.
3
(bar L) - Fig. 8
providing
Flashing lamp
Radio receiver
Magnetic Loops
).

Advertisement

Table of Contents
loading

This manual is also suitable for:

B680h

Table of Contents