PZS-3
8.4. Connecting the shuttle-train section to the PZS-3
You must make at least the following connections (marked grey in the
list):
Supplying transformer for the PZS-3 (s. section 8.3)
Driving transformer (s. section 8.3)
Terminus station 1 and 2
The other connections should be made only if required.
Connecting the shuttle-train section
Section
Outer conductor / all sections
Terminus station 1
Terminus station 2
Free section
If required it is possible to install "free sections" between
the terminus stations and the stops.
Stop 1 (way there) and Stop 2 (way back)
It is possible to divide the section C into two parts and if
neccessary to seperate them by a "free section", in case
the two stops for the two directions are not situated at the
same place.
Stop 1 only (without stop 2)
Stop 2 only (without stop 1)
connection
cutting
point
point
13
18
A
8
D
5
B
9 and 6
C (1, 2)
9
C (1)
6
C (2)
English
Page 27