English
Page 12
Example for a shuttle-train
traffic controlled by a PZS-3
In order to use the PZS-3 it is
sufficient to connect the two
terminus stations. All other
extensions are optional.
By connecting a second rail at
terminus station 2 it is possible to
run two trains alternatingly. In
order to switch between the two
rails an extra bistable relay (not
included in the package) has to be
mounted.
The additional stops 1 (outward
bound) and 2 (return) are
independent of each other. This
allows a different routeing for
outward and return journey (which
is not obligatory).
Extra halts (e.g. at signals or
further stops) can be mounted at
any point of the route. To release
the stop you need a switch or
another external circuit switching
against earth.
PZS-3