Honeywell Home TH8110R1008/U Manual page 32

Table of Contents

Advertisement

®
VISIONPRO
8000 WITH REDLINK™
ISU
Installer Setup
Number
Name
1 to 6 CPH
314
Cool / Compressor
Cycles Per Hour
Stage 1
Note: "Stage 1" is
not displayed if
there is only 1
stage.
1 to 6 CPH
314
Cool / Compressor
Cycles Per Hour
Stage 2
1 to 6 CPH
314
Cool Cycles Per
Hour Stage 3
1 to 6 CPH
314
Cool Cycles Per
Hour Stage 4
68-0312—07
Table 3. Installer Setup (ISU) Table. (Continued)
Settings
Default
3
3
3
3
Residential,
Commercial
Requires
or Both
EIM
Both
No
Both
No
Commercial
No
Commercial
Yes
32
Notes
This ISU is only displayed when ISU 207 Cool /
Compressor Stages is set to 1 stage.
Cycle rate limits the maximum number of times
the system can cycle in a 1 hour period measured
at a 50% load. For example, when set to 3 CPH, at
a 50% load, the most the system will cycle is 3
times per hour (10 minutes on, 10 minutes off).
The system cycles less often when load conditions
are less than or greater than a 50% load.
This ISU is only displayed when ISU 207 Cool /
Compressor Stages is set to 2 stages.
Cycle rate limits the maximum number of times
the system can cycle in a 1 hour period measured
at a 50% load. For example, when set to 3 CPH, at
a 50% load, the most the system will cycle is 3
times per hour (10 minutes on, 10 minutes off).
The system cycles less often when load conditions
are less than or greater than a 50% load.
This ISU is only displayed when ISU 101
Application is set to Commercial and ISU 207 Cool
Stages is set to 3 stages.
Cycle rate limits the maximum number of times
the system can cycle in a 1 hour period measured
at a 50% load. For example, when set to 3 CPH, at
a 50% load, the most the system will cycle is 3
times per hour (10 minutes on, 10 minutes off).
The system cycles less often when load conditions
are less than or greater than a 50% load.
This ISU is only displayed when ISU 101
Application is set to Commercial and ISU 207 Cool
Stages is set to 4 stages.
Cycle rate limits the maximum number of times
the system can cycle in a 1 hour period measured
at a 50% load. For example, when set to 3 CPH, at
a 50% load, the most the system will cycle is 3
times per hour (10 minutes on, 10 minutes off).
The system cycles less often when load conditions
are less than or greater than a 50% load.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents