Zoning And Ventilation; Truedry Dehumidifier With Zoning - Honeywell Home TH8110R1008/U Manual

Table of Contents

Advertisement

®
VISIONPRO
8000 WITH REDLINK™

Zoning and Ventilation

Fig. 352. RedLINK VisionPRO thermostat with an HZ432 zone panel and a ventilator.
Setting up Ventilation Control on RedLINK VisionPRO Thermostats
Select the terminals wired to the ventilator at ISU 1002 (U1, U2, U3). In Fig. 352, the ventilator is wired to U1. To ventilate in
all zones, set ISU 1006 Vent Fan Control to "Equip Controls Fan."

TrueDRY dehumidifier with Zoning

Fig. 353. RedLINK VisionPRO thermostat with an HZ432 zone panel and a TrueDRY dehumidifier.
Setting up Dehumidification Control on RedLINK VisionPRO Thermostats
Select the terminals wired to the dehumidifier at ISU 904 (U1, U2, U3). In Fig. 353, the dehumidifier is wired to U1. To
dehumidify in all zones, set ISU 913 Dehum Fan Control to "Equip Controls Fan."
68-0312—07
FURNACE
C
R
VisionPRO
W
EIM
1
Y
G
INTERLOCK B
AUX W
1
SELECT THE TERMINALS WIRED TO THE VENTILATOR AT ISU 1002
(U1, U2, U3). TO VENTILATE IN ALL ZONES, SET ISU 1006 VENT FAN
CONTROL TO EQUIP CONTROLS FAN.
2
FOR ALL ZONE PANEL WIRING NOT SHOWN IN THIS DIAGRAM, SEE
OTHER ZONING DIAGRAMS OR ZONE PANEL INSTALLATION
INSTRUCTIONS.
VisionPRO
1
EIM
FURNACE
C
R
W
Y
G
DHUM R FAN C
GT
TrueDRY DEHUMIDIFIER
SELECT THE TERMINALS WIRED TO THE VENTILATOR AT ISU 904 (U1, U2, U3).
1
TO VENTILATE IN ALL ZONES, SET ISU 913 DEHUM FAN CONTROL TO EQUIP
CONTROLS FAN.
2
FOR ALL ZONE PANEL WIRING NOT SHOWN IN THIS DIAGRAM, SEE OTHER
ZONING DIAGRAMS OR ZONE PANEL INSTALLATION INSTRUCTIONS.
140
TrueZONE PANEL
2
RH
RC
W1/E
W2
W3
Y1
Y2
G
O
B
ERV/HRV
DS/BK
G
R
B
G
R
M34529
TrueZONE PANEL
2
RH
RC
W1/E
W2
W3
Y1
Y2
G
O
B
DS/BK
Rf
Gf
M34530

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents