SolarEdge SE8K-N4 Installation Manual page 29

Three phase inverter with synergy technology
Table of Contents

Advertisement

Mounting and Connecting the Primary and Secondary Unit(s)
 11.  Assemble the two parts of the cable lock (supplied with the inverter) around the cable connector, 
making sure that the orientation of the printed text on the lock is correct. Push the parts   t ogether 
until they click to lock. To open     t he lock use a flat-bladed screwdriver.
    
Figure 18: Cable lock
28
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se7k-n4Se5k-n4Se4k-n4Se3k-n4

Table of Contents