Step 3: Connecting Power Optimizers in Strings
NOTE
The DC bus of each unit is separate and not shared for all units. Therefore in addition to following the
inverter design rules, each unit should follow the unit design rules as detailed in the Technical
Specifications.
 1.  Connect the Minus (-) output connector of the string's first power optimizer to the Plus (+) output 
connector of the string's second power optimizer.
 2.  Connect the rest of the power optimizers in the string in the same manner.
 
 3.  If you intend to monitor the installation, using the SolarEdge monitoring platform, record the 
physical location of each power optimizer, as described in Providing Installation Information on page 47.
WARNING!
Input and output connectors are not watertight until mated. Open connectors should be mated to
each other or plugged with appropriate watertight caps.
16
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
Figure 5: Power optimizers connected in series

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se7k-n4Se5k-n4Se4k-n4Se3k-n4

Table of Contents