Connection Unit Interface - SolarEdge SE8K-N4 Installation Manual

Three phase inverter with synergy technology
Table of Contents

Advertisement

The following table describes production percentage of AC information by LED color and ON/OFF/P 
switch position.
Indication
Percentage of AC Production:
0 - 33 %
Percentage of AC Production:
33 - 66 %
Percentage of AC Production:
66 - 100 %

Connection Unit Interface

 
The Connection Unit is part of the Primary Unit.  
There are two types of Connection Units, with MC4 connectors ( See Figure 10) or with cable glands for 
DC connection( see Figure 11
 
Safety Switch:   a  manually operated safety switch for disconnecting the DC   p ower of the   S olarEdge 
l
system.
 
Cables for connection to the Secondary Unit(s):
l
 
Communication cable
o
 
DC Cable
o
 
AC Cable
o
   
DC input:   M C4   c onnectors / cable glands: for DC+/- connection of the PV installation, there are 3 
l
glands / 6 MC4 connectors for each unit.
Each gland has 3 openings to support three strings:
 
each opening can support 5-8.8 mm PV cable outer diameter
o
 
each terminal block in the connection unit can support 4-10mm
o
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
ON/
OFF/ P
switch
Red
position
OFF
ON (1)
OFF
OFF
Figure 9: Connection Unit front and side interface
Chapter 3: Installing the Primary and Secondary Unit(s)
LED color
Green
Blue
ON
OFF
OFF
ON
ON
ON
2
 PV wire cross section
Comment
This indicates
power production
as percentage of
rated peak AC
output power
 
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se7k-n4Se5k-n4Se4k-n4Se3k-n4

Table of Contents