Texas Instruments TPS7A10EVM-004 User Manual page 10

Table of Contents

Advertisement

Bill of Materials
Designator
Quantity
Value
!PCB1
1
C3, C4
2
2.2uF
C7
1
0.1uF
J1, J10, J11
3
J3
1
J4, J12
2
J5, J6
2
J9
1
R1
1
10.2k
SH-J1, SH-J2
2
1x2
TP1, TP2, TP3, TP4,
6
TP5, TP6
U1
1
C1, C6
0
2.2uF
C2, C5
0
2.2uF
FID1, FID2, FID3
0
J2, J7, J8
0
(1)
These assemblies are ESD sensitive; observe ESD precautions.
(2)
These assemblies must be clean and free from flux and all contaminants. Do not use a no-clean flux.
(3)
These assemblies must comply with workmanship standards according to IPC-A-610 Class 2.
(4)
Unless otherwise noted in the Alternate Part Number or Alternate Manufacturer columns, all parts may be substituted with equivalents.
10
TPS7A10EVM-004 Evaluation Module
Table 1. TPS7A10EVM-004 BOM
Package
Description
Reference
Printed Circuit Board
CAP, CERM, 2.2 uF, 10 V,
0402
+ /- 20%, X5R, 0402
CAP, CERM, 0.1 uF, 10 V,
0402
+ /- 10%, X7R, 0402
Standard Banana Jack,
6092
Insulated, Black
BANANA JACK, 15A,
940x438x438 mil
Insulated, Nylon, Yellow
Header, 2.54 mm, 2x1,
Header, 2.54 mm,
Gold, R/A, SMT
2x1, R/A, SMT
Standard Banana Jack,
6091
Insulated, Red
Header, 100 mil, 3x1, Gold,
Samtec_TSM-103-
SMT
01-X-SV
RES, 10.2 k, 1%, 0.1 W,
0603
0603
Shunt, 100 mil, Gold plated,
Shunt
Black
Testpoint_Keyston
Test Point, Compact, SMT
e_Compact
300 mA Low VIN, Low
VOUT, Ultra-Low Dropout
YKA0005AFAF
Regulator, YKA0005AFAF (-
5)
CAP, CERM, 2.2 uF, 10 V,
0805
+ /- 20%, X7R, 0805
CAP, CERM, 2.2 uF, 10 V,
0603
+ /- 10%, X7R, 0603
Fiducial mark. There is
N/A
nothing to buy or mount.
Connector, SMA Jack,
SMA
Vertical, Gold, SMD
Copyright © 2018, Texas Instruments Incorporated
(1) (2) (3) (4)
Part Number
Manufacturer
LP004
Any
GRM155R61A225ME95
MuRata
GRM155R71A104KA01D
MuRata
6092
Keystone
108-0907-001
Cinch Connectivity
878980204
Molex
6091
Keystone
TSM-103-01-L-SV
Samtec
CRCW060310K2FKEA
Vishay-Dale
969102-0000-DA
3M
5016
Keystone
TPS7A1011YKA
Texas Instruments
GRM21BR71A225MA01 L
MuRata
GRM188R71A225KE15D
MuRata
N/A
N/A
142-0711-201
Cinch Connectivity
www.ti.com
Alternate Part
Alternate
Number
Manufacturer
SNT-100-BK-G
Samtec
Texas Instruments
SBVU040 – February 2018
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS7A10EVM-004 and is the answer not in the manual?

Questions and answers

Table of Contents