Texas Instruments TPS7A94EVM-046 User Manual

Texas Instruments TPS7A94EVM-046 User Manual

Evaluation module

Advertisement

Quick Links

www.ti.com
User's Guide
TPS7A94EVM-046 Evaluation Module
This user's guide describes the operational use of the TPS7A94EVM-046 evaluation module (EVM) as a
reference design for engineering demonstration and evaluation of the TPS7A9401DSC, an ultra-low noise,
ultra-high PSRR, RF low-dropout (LDO) linear regulator. Included in this user's guide are setup and operating
instructions, thermal and layout guidelines, a printed circuit board (PCB) layout, a schematic diagram, and a bill
of materials (BOM).
Throughout this document the terms demonstration kit, evaluation board, and evaluation module are
synonymous with the TPS7A94EVM-046.
SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022
Submit Document Feedback
ABSTRACT

Figure 1-1. TPS7A94EVM-046 Evaluation Module

Copyright © 2022 Texas Instruments Incorporated
TPS7A94EVM-046 Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS7A94EVM-046 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS7A94EVM-046

  • Page 1: Figure 1-1. Tps7A94Evm-046 Evaluation Module

    ABSTRACT Figure 1-1. TPS7A94EVM-046 Evaluation Module This user's guide describes the operational use of the TPS7A94EVM-046 evaluation module (EVM) as a reference design for engineering demonstration and evaluation of the TPS7A9401DSC, an ultra-low noise, ultra-high PSRR, RF low-dropout (LDO) linear regulator. Included in this user's guide are setup and operating instructions, thermal and layout guidelines, a printed circuit board (PCB) layout, a schematic diagram, and a bill of materials (BOM).
  • Page 2: Table Of Contents

    2.3 Equipment Connections..............................Operation....................................5 4 PCB Layout....................................6 Schematic....................................8 6 Bill of Materials..................................7 Revision History................................... List of Figures Figure 1-1. TPS7A94EVM-046 Evaluation Module........................Figure 4-1. Assembly Layer.................................6 Figure 4-2. Top Layer Routing..............................Figure 4-3. First Middle Layer..............................6 Figure 4-4. Second Middle Layer..............................6 Figure 4-5.
  • Page 3: Introduction

    Introduction 1 Introduction Texas Instruments' TPS7A94EVM-046 helps design engineers evaluate the operation and performance of the TPS7A94 linear regulator for possible use in their own circuit application. This particular EVM configuration contains a single high-accuracy, small size, adjustable linear regulator for a wide range of applications. The...
  • Page 4: Evm Setup

    EVM Setup www.ti.com 2 EVM Setup This section describes how to properly connect and set up the TPS7A94EVM-046, including the jumpers and connectors on the EVM board. 2.1 Inputs/Outputs Connectors and Jumper Descriptions 2.1.1 J1 – IN Input power-supply voltage connector with ground connection.
  • Page 5: Equipment Connections

    Operate the equipment using the following steps: 1. Turn on the power supply 2. Vary the respective loads and input voltages, as necessary, for test purposes SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022 TPS7A94EVM-046 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 6: Pcb Layout

    PCB layout for this EVM. Figure 4-2. Top Layer Routing Figure 4-1. Assembly Layer Figure 4-4. Second Middle Layer Figure 4-3. First Middle Layer TPS7A94EVM-046 Evaluation Module SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 7: Figure 4-5. Bottom Layer Routing

    PCB Layout Figure 4-5. Bottom Layer Routing SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022 TPS7A94EVM-046 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 8: Schematic

    Schematic www.ti.com 5 Schematic Figure 5-1 shows the schematic for this EVM. Figure 5-1. TPS7A94EVM-046 Schematic TPS7A94EVM-046 Evaluation Module SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 9: Bill Of Materials

    4. Unless otherwise noted in the Alternate Part Number or Alternate Manufacturer columns, all parts can be substituted with equivalents. SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022 TPS7A94EVM-046 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 10: Revision History

    Changes from Revision * (September 2021) to Revision A (April 2022) Page • Added note to TP2 – PG section........................• Added note to TP4 – PG_FB section........................4 TPS7A94EVM-046 Evaluation Module SBVU070A – SEPTEMBER 2021 – REVISED APRIL 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 11 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 12 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 13 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 14 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 15 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 16 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2022, Texas Instruments Incorporated...

Table of Contents