www.ti.com
User's Guide
TPS7A13EVM-057 Evaluation Module
This user's guide describes the operational use of the TPS7A13EVM-057 evaluation module (EVM) as a
reference design for engineering demonstration and evaluation of the TPS7A13 low-dropout linear regulator
(LDO). Included in this user's guide are setup and operating instructions, thermal and layout guidelines, a
printed-circuit board (PCB) layout, a schematic diagram, and a bill of materials (BOM).
Throughout this document, the terms evaluation board, evaluation module, and EVM are synonymous with the
TPS7A13EVM-057.
1
Trademarks..............................................................................................................................................................................2
2
Introduction.............................................................................................................................................................................3
3
Setup........................................................................................................................................................................................3
Operation...................................................................................................................................................5
Layout...........................................................................................................................................................................9
Schematic.....................................................................................................................................................11
6 Bill of Materials.....................................................................................................................................................................
SBVU074 - NOVEMBER 2021
Submit Document Feedback
ABSTRACT
Figure 1-1. TPS7A13EVM-057 Evaluation Module
Table of Contents
Descriptions.........................................................................................................................3
Descriptions..........................................................................................3
Copyright © 2021 Texas Instruments Incorporated
Table of Contents
TPS7A13EVM-057 Evaluation Module
6
12
1
Need help?
Do you have a question about the TPS7A13EVM-057 and is the answer not in the manual?
Questions and answers