FAAC J275 HA 2K20 Translation Of The Original Instructions page 15

Table of Contents

Advertisement

If the total number of bollards in the system is greater than 3, connect 2 or more boards in a master-slave configuration as indicated below.
A single master board can control multiple slave boards at the same time.
!
It is recommended to balance the load on the boards (e.g. for 4 bollards, connect 2 bollards to the master board and 2 bollards to the slave board.
Master JE275 board
dF
05
F
1.
=
+
-
o 1
1 1
2.
=
+
+
F
P1
no
=
o 2
12
=
P2
no
=
+
-
 10 s
b6
Y
3.
=
+
+
-
+
F
Slave JE275 board
dF
05
F
1.
=
LO
C
=
+
-
F
 10 s
03
Y
2.
=
+
+
F
b6
Y
=
+
-
F
LO
Cu
3.
=
F
+
+
-
-
F
F
o 3
1 5
4.
=
+
+
F
P3
no
=
+
+
-
-
F
F
J275 HA 2K20
1 2 3
F
J5
J3
1 2 3
F
F
4 5 6
J5
J3
4 5 6
M1
~
M2
~
M3
~
1
2
3
M4
~
M5
~
M6
~
1
2
3
4
5
6
15
MOT2
COM
MOT1
FAN
COM
COM
LAMP
J2
GND
OUT 4
OUT 3
OUT 3
OUT 2
OUT 1
+24 V
+24 V
GND
GND
EMERGENCY
STOP
FSW
CLOSE
OPEN A
LOOP 2
LOOP 2
LOOP 1
LOOP 1
J1
MOT2
COM
MOT1
FAN
COM
COM
LAMP
J2
GND
OUT 4
OUT 3
OUT 3
OUT 2
OUT 1
+24 V
+24 V
GND
GND
EMERGENCY
STOP
FSW
CLOSE
OPEN A
LOOP 2
LOOP 2
LOOP 1
LOOP 1
J1
2 1
532270 - Rev.A

Advertisement

Table of Contents
loading

Table of Contents