www.ti.com
6
Schematic
S1
7
Bill of Materials
Qty
Designator
1
C1
J1, J2, J3,
5
J4, J5
0
R1
1
R2
1
S1SH-J4
1
S1
(4)
1
U1
1
(1)
These assemblies are electrostatic-discharge (ESD) sensitive; observe ESD precautions.
(2)
These assemblies must be clean and free from flux and all contaminants. Do not use no-clean flux.
(3)
These assemblies must comply with workmanship standards IPC-A-610 Class 2.
(4)
Cannot be substituted. All other components can be substituted with equivalent manufacturer components.
SBVU023 – August 2014
Submit Documentation Feedback
VPU
VDD
J4
C1
0.1 µF
R2
1 M
MR
J2
Figure 4. TPS3847085EVM-577 Schematic
Table 1. TPS3847085EVM-577 Bill of Materials
Value
Description
Capacitor, Ceramic Chip, 20V, X5R,
100 nF
±10%
Header, Male 2-pin, 100mil spacing,
47 kΩ
RES 47K OHM 1/20W 5% 0201 SMD
1 MΩ
RES, 1.00Meg ohm, 1%, 0.1W, 0603
1 x 2
Shunt, 100mil, Gold plated, Black
Switch, Tactile, SPST-NO, 1VA, 32V,
SMT
IC, Supply Voltage Supervisory Circuit,
8.5V
PCB, 1.30 in x 1.645 in x 0.062 in
Copyright © 2014, Texas Instruments Incorporated
VDD
J1
J5
VDD
TPS3847
RESET
GND
GND
1
Size
402
0.100 inch x 2
0603
0603
Shunt
6.3 x 5.36 x 6.6 mm, SMT
SOT23-5
1.30 in x 1.70 in x 0.062 in
TPS3847085EVM-577 Evaluation Module
RPU
R1
1
47 k
RESET
J3
Not
Installed
(1) (2) (3)
Part Number
STD
STD
PEC02SAAN
Sullins
ERJ-1GEJ473C
Panasonic
CRCW06031M00FKEA
Vishay-Dale
969102-0000-DA
3M
C&K
KT11P2JM34LFS
Components
TPS3847085DBV
TI
PWR577
Any
Schematic
Manufacturer
5
Need help?
Do you have a question about the TPS3847085EVM-577 and is the answer not in the manual?