Getting Started; Assembling Realtrax; Lubricating The Engine - Rail King Ready-To-Run SD70ACe Diesel Set Operation Manual

Hide thumbs Also See for Ready-To-Run SD70ACe Diesel Set:
Table of Contents

Advertisement

Getting Started

Assembling RealTrax

The quick connectors and built-in roadbed allow you to set up RealTrax anywhere, including
carpeted surfaces.
Knock-out must be removed
STEP
1
before remote lock-on can
be installed
Make sure the metal
STEP
4
contacts line up.

Lubricating the Engine

Lubricate all exposed moving parts before operating using a multi-purpose, plastic-compatible
oil (available with M.T.H.'s Maintenance Kit (#30-50010) , sold separately) or a light household
oil. Follow the lubrication points.
Lubricate Axles
Figure 1: Lubrication Points on the Locomotive
RailKing® SD70ACe Diesel Ready-To-Run Set w/Proto-Sound® 3.0
®
Remove knock-out from
STEP
2
outer edge of track by
holding and twisting up
with a pair of pliers
REMOVE TAB
FROM OUTER EDGE
STEP
Align Quick
5
Connect Plugs
Grease Gears
Lubricate Pick Up Roller Axles (L)
4
STEP
3
(Lock-on is the interface between
STEP
6
Gently push together RealTrax
Lubricate Pick-Up Rollers
(Do Not Lube the Flat Part
of Pick-Up Rollers)
Lubricate All Wheel Axles (L)
Insert lock-on into
knock-out tab
the track and transformer)

Advertisement

Table of Contents
loading

Table of Contents