Getting Started; Assembling Realtrax; Connecting The Transformer - Rail King Ready-to-Run F--3 Operation Manual

Diesel freight/pasenger set
Table of Contents

Advertisement

Getting Started

Assembling RealTrax

The quick connectors and built-in roadbed allow you to set up RealTrax anywhere, including
carpeted surfaces.
Knock-out must be removed
STEP
1 1
before remote lock-on can
be installed
Make sure the metal
STEP
4 4
contacts line up.

Connecting the Transformer

The transformer included with this set provides an easy-to-use, safe power source for AC-
powered trains and accessories.
To complete the connection between the track and the transformer, simply plug in the color-
coded wire harness that was included in your set and plug the transformer into your wall
outlet.
Plug the wire from the transformer into the Z-Controller's center port.
Connect the Wires from the Z-Controller to the Lighted Lock-On, being sure that the
wires are connected from red-to-red and black-to-black.
Unplug when not in use.
Also functions as a binding post.
Red Harness
Wire/Plug
RailKing F-3 Diesel Freight/Passenger Set with Horn & Bell
®
STEP
Remove knock-out from
2 2
outer edge of track by
holding and twisting up
with a pair of pliers
REMOVE TAB
FROM OUTER EDGE
STEP
5 5
Connect Plugs
Red Harness
Wire/Plug
Black Harness
Wire/Plug
Align Quick
Black Harness
Wire/Plug
4
STEP
3 3
Insert lock-on into
knock-out tab
(Lock-on is the interface between
the track and transformer)
STEP
6 6
Gently push together RealTrax

Advertisement

Table of Contents
loading

Table of Contents