Download Print this page

Opening The Controller; Changing Communication Settings; Closing The Controller - Unitronics Vision OPLC V130-33-B1 Installation Manual

Hide thumbs Also See for Vision OPLC V130-33-B1:

Advertisement

Vision™ OPLC™

Opening the Controller

Before performing these actions, touch a grounded object to discharge any electrostatic
charge.
Avoid touching the PCB board directly. Hold the PCB board by its connectors.
1. Turn off the power supply, disconnect, and dismount the controller.
2. The back cover of the controller comprises 4 screws, located in the corners. Remove the screws,
and pull off the back cover.

Changing Communication Settings

Closing the Controller

Note: You must replace the back cover securely before powering up the controller.
Riga
tel. +371 6738 1617
klinkmann@klinkmann.lv
Helsinki
tel. +358 9 540 4940
automation@klinkmann.fi
Yekaterinburg
tel. +7 343 287 19 19
yekaterinburg@klinkmann.spb.ru
Vilnius
tel. +370 5 215 1646
post@klinkmann.lt
1. To access the communication
jumpers, hold the Power Supply
PCB by its edges and steadily pull
the board off.
2. Locate the jumpers, and then
change the settings as required.
Jumper settings are shown on
page 6.
1. Gently replace the board. Make
certain that the pins fit correctly
into their matching receptacle.
Do not force the board into place;
doing so may damage the
controller.
2. Replace the back cover of the
controller and fasten the corner
screws.
St. Petersburg
tel. +7 812 327 3752
klinkmann@klinkmann.spb.ru
Samara
tel. +7 846 273 95 85
samara@klinkmann.spb.ru
Tallinn
tel. +372 668 4500
klinkmann.est@klinkmann.ee
Moscow
tel. +7 495 641 1616
moscow@klinkmann.spb.ru
Кiev
tel. +38 044 495 33 40
klinkmann@klinkmann.kiev.ua
Мinsk
tel. +375 17 200 0876
minsk@klinkmann.com

Advertisement

loading