Download Print this page

Din Rail Mounting; Wiring Procedure - Unitronics Vision OPLC V130-33-B1 Installation Manual

Hide thumbs Also See for Vision OPLC V130-33-B1:

Advertisement

DIN-rail Mounting
1. Snap the controller onto the DIN
rail as shown in the figure to the
right.
2. When properly mounted, the
controller is squarely situated on
the DIN-rail as shown in the figure
to the right.
Wiring
Do not touch live wires.
Install an external circuit breaker. Guard against short-circuiting in external wiring.
Use appropriate circuit protection devices.
Unused pins should not be connected. Ignoring this directive may damage the device.
Double-check all wiring before turning on the power supply.
To avoid damaging the wire, do not exceed a maximum torque of 0.5 N·m (5 kgf·cm).
Do not use tin, solder, or any substance on stripped wire that might cause the wire strand
Caution
to break.
Install at maximum distance from high-voltage cables and power equipment.

Wiring Procedure

Use crimp terminals for wiring; use 26-12 AWG wire (0.13 mm
1. Strip the wire to a length of 7±0.5mm (0.250–0.300 inches).
2. Unscrew the terminal to its widest position before inserting a wire.
3. Insert the wire completely into the terminal to ensure a proper connection.
4. Tighten enough to keep the wire from pulling free.
Input or output cables should not be run through the same multi-core cable or share the same wire.
Allow for voltage drop and noise interference with input lines used over an extended distance. Use
wire that is properly sized for the load.
The controller and I/O signals must be connected to the same 0V signal.
4
V130-33-B1 Installation Guide
2
2
–3.31 mm
):
Unitronics

Advertisement

loading