Leveling & Sealing Cabinet To Floor - True Manufacturing Company TR1RRI-1S Installation Manual

Tr, ta, & tg models (spec series)
Table of Contents

Advertisement

True Food Service Equipment, Inc.
PASS THRU UNIT INSTALLATION
Full double door pass thru units have two shipping
brackets on the inside of the unit. These two brackets
need to be removed once the unit has been placed into
its final location.
Shipping Bracket Removal
A. After unit has been placed into a final location open
the front and rear doors for easy access to the two
brackets (see image 1).
B. Use a flat head screw driver to loosen the thumb
screws from the brackets. Each bracket has two
thumb screws on each end and four in the middle
(see image 2).
WARNING
Be careful not to scratch or damage the cabinet when
removing the bracket.
LEVELING
A. Set unit in its final location. Be sure there is adequate
ventilation in your room. Under extreme heat
conditions, (100°F+, 38°C+), you may want to install
an exhaust fan.
WARNING
Warranty is void if ventilation is insufficient.
B. Proper leveling of your TRUE cooler is critical to
operating success (for non-mobile models). Effective
condensate removal and door operation will be
effected by leveling.
C. The cooler should be leveled front to back and side to
side with a level.
SEALING CABINET TO FLOOR
Optional
A. It may be necessary to seal the cabinet to the floor for
local sanitary codes or if the customer so desires. TRUE
recommends either of the following methods:
B. Using a vinyl cove base trim as produced by
Armstrong, Johnson, or Kentile (available at floor
covering suppliers) or using mastics available at hard-
ware stores.
C. When applying the cove base trim, thoroughly clean
both the cabinet and floor of dirt and grease. Apply a
9
INSTALLATION / OPERATION INSTRUCTIONS
............ www.truemfg.com ............
1
Bracket location.
2
Bracket removal. Thumb screw locations.
D. Ensure that the drain hose or hoses are positioned in
the pan.
E. Free plug and cord from the top of the cabinet (do
not plug in).
F. The unit should be placed close enough to the
electrical supply so that extension cords are never
used.
WARNING
Cabinet warranties are void if OEM power cord is tampered
with. True will not warranty any units that are connected to
an extension cord.
recommended contact cement to the cove base trim.
After cove base trim has dried, fill in cracks and
joints with a caulking material.
D. When applying a mastic, draw an outline of the cabi-
net on the floor. Raise and block the front side of the
cabinet. Apply a bead of mastic to the floor 1/2"
inside the outline drawn. Lower the cabinet. Raise and
block the rear side of the cabinet. Apply the bead of
mastic, lower the cabinet.
WARNING
Any relocation of this unit requires
shipping bracket to be reinstalled
before proceeding.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tr2rrt-2s-2sTr2r-2g

Table of Contents