System Reboot; Ping - Planet GS-5220-24T4XVR User Manual

L2+ gigabit/10 gigabit managed lcd switch
Hide thumbs Also See for GS-5220-24T4XVR:
Table of Contents

Advertisement

Buttons
: Click to reset the configuration to Factory Defaults.
: Click to return to the Port State page without resetting the configuration.
To reset the Managed Switch to the Factory default setting, you can also press the hardware reset button
at the front panel about 10 seconds. After the device is rebooted, you can login the management Web
interface within the same subnet of 192.168.0.xx.

4.7.9 System Reboot

The Reboot page enables the device to be rebooted from a remote location. Once the Reboot button is pressed, user has to
re-login the Web interface about 60 seconds later; the System Reboot screen in
Buttons
: Click to reboot the system.
: Click to return to the Port State page without rebooting the system.
You can also check the SYS LED on the front panel to identify whether the System is loaded completely or
not. If the SYS LED is blinking, then it is in the firmware load stage; if the SYS LED light is on, you can use
the Web browser to login the Managed Switch.

4.7.10 Ping

This page allows you to issue ICMP PING packets to troubleshoot IP connectivity issues.
After you press "Start", 5 ICMP packets are transmitted, and the sequence number and roundtrip time are displayed upon
reception of a reply. The page refreshes automatically until responses to all packets are received, or until a timeout occurs. The
User's Manual of GS-5220-24T4XV(R) Managed LCD Switch
Figure 4-7-8-1: Factory Default Page Screenshot
Figure 4-7-9-1: System Reboot Page Screenshot
337
Figure 4-7-9-1
appears.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-5220-24t4xv

Table of Contents