Imb Operation Notes - GDC SX-3000 User Manual

Standalone integrated media block
Hide thumbs Also See for SX-3000:
Table of Contents

Advertisement

6. IMB OPERATION NOTES

6.1. Power Up Sequence
Always power up any external storage (PSD-3000-U/P, or external NAS) before
powering up the projector. The external storage must be powered up first to be
correctly identified by the SX-3000
6.2. Power Down Sequence
Always power down the SX-3000 system and projector with the following steps:
1. Power down the SX-3000 by using the SMS -> Shutdown button.
2. Power down the projector after the SX-3000 is powered down.
3. Power down any external storage attached to the SX-3000.
February 14, 2013
.
- 149 -
6. IMB OPERATION NOTES
SX-3000 Standalone Integrated Media Block™ User Manual

Advertisement

Table of Contents
loading

Table of Contents