Knightsbridge EMPOWERST Installation & Maintenance Manual

Knightsbridge EMPOWERST Installation & Maintenance Manual

Advertisement

Quick Links

INSTALLATION & MAINTENANCE MANUAL
EMPOWERST

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EMPOWERST and is the answer not in the manual?

Questions and answers

Summary of Contents for Knightsbridge EMPOWERST

  • Page 1 INSTALLATION & MAINTENANCE MANUAL EMPOWERST...
  • Page 2 These instructions should be read carefully and retained after installation by the end user for future reference and maintenance. These instructions should be used to aid installation of the following product: EMPOWERST SAFETY • This product must be installed in accordance with the latest edition of the IEE Wiring Regulations (BS7671) and current Building Regulations.
  • Page 3 Provide power to the required point of installation Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to infringe • Cut a suitable hole in the mounting surface as per the cut-out details (see Fig. 1) ensuring not to infringe with any joists, gas / water pipes or electrical cables with any joists, gas / water pipes or electrical cables •...
  • Page 4 SELF-TEST FUNCTION This product is programmed to carry out its own self-test function according to the following programme: 24 hours after first power-on 3-hour duration test Then every 28 days 30 second monthly function test And every 52 weeks 3-hour duration test The downlight has one tri-colour LED which is green when charging, white when in emergency mode, and red to indicate faults.
  • Page 5 GENERAL The light source of this luminaire is not replaceable; when the light source reaches its end of life the whole luminaire should be replaced. Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may damage the product.
  • Page 6 TESTING FOR EMERGENCY LUMINAIRES Recommended routine test procedure in accordance with BS5266: • Daily check – check status of LED indicator • Monthly functional test – the luminaire will perform this function without any action from the user. Alternatively, simulate a mains supply failure for approx. 30 seconds by operation of key switch, or switching off circuit breaker.
  • Page 7 TEST RECORD SHEET SIGNED DATE INITIAL COMMISSIONING 3 HOUR TEST FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR MONTH TEST SIGNED DATE SIGNED DATE SIGNED DATE SIGNED DATE SIGNED DATE FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL FUNCTIONAL...
  • Page 8 INTERNAT CONTACT D INTERNATIONAL CONTACT DETAILS 45°C ML Accessories Limited LU5 4LT www.mlaccessories.co.uk DCSEP21_V2...