Knightsbridge EMPOWER2 Installation & Maintenance Manual

Knightsbridge EMPOWER2 Installation & Maintenance Manual

Advertisement

INSTALLATION & MAINTENANCE MANUAL
EMPOWER2 / EMPOWERW2
IP
230
V
20
50Hz
54

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EMPOWER2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Knightsbridge EMPOWER2

  • Page 1 INSTALLATION & MAINTENANCE MANUAL EMPOWER2 / EMPOWERW2 50Hz...
  • Page 2 These instructions should be read carefully and retained after installation by the end user for future EMPOWER2 & EMPOWERW2 reference and maintenance. ructions should be read carefully and retained after installation by the end user for future reference and These instructions should be used to aid installation of the following products: These instructions should be read carefully and retained after installation by the end user for future reference and ce. EMPOWER2 / EMPOWERW2 maintenance. ructions should be used to aid installation of the following products: These instructions should be used to aid installation of the following products: SAFETY R2 & EMPOWERW2 EMPOWER2 & EMPOWERW2 •...
  • Page 3 Fig 2 • Connect the battery to the inverter (see Fig 3) Connect the battery to the inverter (see Fig 3) • Battery plug and socket Fig 3 Fig 3 • Place the inverter and battery pack into the ceiling via the cut-out • Place the inverter and battery pack into the ceiling via the cut-out • Push the spring clips either side of the fitting up and locate into ceiling •...
  • Page 4 TESTING FOR EMERGENCY LUMINAIRES Recommended routine test procedure in accordance with BS5266 Daily check – check LED charge indicator is illuminated Monthly functional test – simulate a mains supply failure for approx. 30 seconds by operation of key switch or switching off circuit breaker. Ensure normal supply is restored after test and ensure charge indicator is illuminated Twice yearly conduct a one hour duration test - simulate a mains supply failure for a one hour continuous test by operation of key switch or switching off circuit breaker.

This manual is also suitable for:

Empowerw2

Table of Contents