Maintenance History Log - Key Automation ALT3KF Instructions And Warnings For Installation And Use

Automation for road barriers with 3 to 8 m bars
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 30
EN

10.1 - Maintenance History Log

All maintenance, repair, checking and adjustment tasks performed
on the automation system must be listed in the Maintenance Log.
It must be filled out at every service and kept by the Owner - to be
available in case of inspections by the organisms in charge.
The Maintenance Log refers to the following automation system:
Model
Installed on
DATE
56
MAINTENANCE SERVICE LOG
SERVICE PERFORMED
(repair, check, adjustment, ...)
According to the "Maintenance Schedule" (paragraph 9.1), a periodic
general check is recommended every 6 months or every 50,000 ope-
ning/closing cycles, and so is the replacement of some components
according to the "Routine replacements" schedule (paragraph 9.2)
Serial Number
At
TECHNICIAN'S
SIGNATURE
OWNER'S
SIGNATURE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents