Installing Rail Mounted Equipment Into The Rack - HP Rack System/E User Manual

Rack system/e
Table of Contents

Advertisement

Chapter 3
top perforations. In special cases such as back to back product mounting, the aid of an extractor
fan may be necessary, as illustrated in Figure 3-1.
When the proper system is installed, internal temperature rise is typically less than 15C (27F)
over ambient temperature.
NOTE
Hewlett-Packard recommends that the customer monitor the internal
temperature of the rack. The internal temperature should not exceed the heat
rating of any installed instruments.

Installing Rail Mounted Equipment into the Rack

Equipment is installed by first attaching equipment rails between both front and rear columns, as
shown in Figure 3-2. A clip nut goes behind the rail and a spacer block at the top hole the EIA
unit. This is the same hole the screw lines up with.
Equipment is placed on the rails, and secured with rear tie-downs, as shown below in Figure 3-3.
12
Figure 3-1. Air Flow through the HP Rack System/E
Figure 3-2. Attaching Rail to Column
Installation Guidelines

Advertisement

Table of Contents
loading

Table of Contents