Output Shaft - Jeep Wrangler 1999 Electronic Service Manual

Hide thumbs Also See for Wrangler 1999:
Table of Contents

Advertisement

21 - 28
TRANSMISSION AND TRANSFER CASE
DISASSEMBLY AND ASSEMBLY (Continued)
Fig. 99 Select Input Shaft Bearing Snap-ring
Fig. 100 Install Output Shaft Pilot Bearing Rollers

OUTPUT SHAFT

DISASSEMBLY
(1) Remove input shaft and output shaft pilot
bearing rollers from output shaft.
(2) Measure and note thrust clearance of output
shaft gears (Fig. 101). Clearance should be 0.10 –
0.25 mm (0.004 – 0.010 in.).
Fig. 101 Check Output Shaft Gear Thrust Clearance
(3) Remove output shaft fifth gear snap ring with
two screwdrivers (Fig. 102).
(4) Using Bearing Splitter P-334 or suitable press
plates positioned under first gear, press fifth gear,
rear bearing, first gear, and first gear bearing inner
race off output shaft (Fig. 103).
TJ

Advertisement

Table of Contents
loading

Table of Contents