Download Print this page

Zeppelin Design Labs ALTURA MKII Plus Assembly Instructions Manual page 18

Advertisement

c. Installation on the main board:
i.
Place one 12mm standoff on each of the corner pins of the headers. Put one of the small
holes through the header pin first, so that the small hole side of the header is closest to
the display PCB (43,44).
43
ii. While holding the display board upside down, so the headers don't fall off the pins,
slide the headers into the holes on the main board. This is kind of a tricky process, so it
helps to slide in one side (6 pins) of the display board headers at a time. Make sure that
the dot on the display board (on the top right) is closest to the dot on the main board
(46). Once again, do not install the display board upside down!
45
8. Power light (LED)
a. Place the LED in the LED standoff (part#ST-60-10). Feed the leads in through the open end of
the standoff, and thread the leads through the two small holes in the other end. The red
plastic body of the LED should be up against the open end of the standoff.
47
44
46
48
18

Advertisement

loading