STEP 5 – Solid Linkage
•
Connect the solid linkage through the bottom fix plate using the Ø8 flat washer and tighten with an M8
lock nut.
•
Connect the other end of the linkage to the flow control with an Ø8 flat washer and M8 lock nut.
•
Install the hopper screen in the bottom of the hopper.
•
Before using the spreader make sure all the hardware is tightened.
•
Use the rain cover as needed to protect material in the hopper or when spreader is being stored.