ELGA CENTRA S200 US Operator's Manual page 24

Table of Contents

Advertisement

CENTRA - S200 US/CENTRA - R200 US Operator Manual
Page 18
CAUTION!
WARNING!
CENTRA - S200 US/CENTRA - R200 US Version 01 – 08/14
The termination of cables should
comply with local wiring regulations.
All earth connections should be made
using ring tags that are attached to the
cable using the correct crimping tool.
14. CONNECT the supply earth to the central earthing
point on the electrical back plate along with the earth
wire from the electrical cover.
15. REPLACE the earthing nut and washers and
TIGHTEN.
THIS
APPLIANCE
PROPERLY EARTHED. ENSURE THE
EARTH STUD, LOCATED NEXT TO
THE MCB, IS USED TO EARTH THE
INCOMING MAINS SUPPLY.
16. ENSURE that an earth continuity test is completed
before applying power to the unit.
17. REPLACE the electrical cover and screws and
ensure an effective seal from water ingress.
Note:
Until the unit has been fully commissioned it is
recommended
unsecured.
MUST
that
the
front
door
ELGA
BE
remain

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Centra r200 usCentra-s200hfv usCentra-r200hfv us

Table of Contents