MANUAL OPERATION
Force Charge to Battery
Tap Advanced Setting→Battery Setting →Force Charge to Battery→SOC(discontinue)→Save
to set the SOC and start force charge to battery function.
After starting the force battery to charge function, the power of the system gives priority to
charging the battery until the preset SOC is reached.

3.3 CEI Auto-Test Function

The PV auto-test function of CEI is integrated into the PV Master App to satisfy Italian safety
requirements. For detailed instructions regarding this function, please refer to "PV Master
Operation Instructions".

3.4 Startup/shutdown Procedure

DC switch is used to cut off PV input power while the breaker equipped on the battery is used to
cut off battery power.
When you want to shut down the inverter during an event, you shall turn off the inverter DC
switch and the battery DC breaker.
When you want to start-up the inverter after rectification, you shall turn on the inverter DC
switch and the battery DC breaker.

3.5 SEMS Portal

SEMS Portal is an online monitoring system. After completing the
installation of communication connection, you can access
www.semsportal.
com
or download the app by scanning the QR code to monitor your PV plant
and device.
SEMS Portal App
Please contact the after-sales for more operation of SEMS Portal.