Electrical Check; Fit Pressure Gauge; Vent Oil Pump; Adjust Oil Pressure - Stanley Alpha 120K Commissioning Instructions

Hide thumbs Also See for Alpha 120K:
Table of Contents

Advertisement

ELECTRICAL CHECK

Checks to ensure electrical safety should be carried out
by a competent person.
Switch on the Electricity

FIT PRESSURE GAUGE

SEE FIG. 12
Remove the bleed screw from the manifold and fit an oil
pressure gauge with R 1/8 connection to check the pump
output pressure.
Set the boiler burner time clock switch to continuous and
turn the boiler thermostat to maximum. The boiler burner
should run on pre-purge for 7-15 seconds, with the
ignition spark energised. The solenoid valve should then
open allowing the burner to fire.
Until all the air from the oil pump is flushed out there may
be some flame instability resulting in the burner locking
out.
This will be shown by the burner stopping and the
illumination of the signal light in the reset button of the
control box . In this event, wait at least 30 seconds, then
press the re-set button to restart.

VENT OIL PUMP

SEE FIG. 12
Whilst the burner is running, vent air from the pump by
slackening the pressure gauge connection sufficient to
allow air to bleed out. When bubble free oil seeps out re-
tighten.

ADJUST OIL PRESSURE

SEE FIG. 13
Whilst the burner is running check the oil pressure on the
pressure gauge.
If the pressure gauge is not indicating the correct reading
then adjust the pressure by turning the pressure regulator
clockwise to increase or anti-clockwise to decrease the
pressure until the pressure gauge reads 10 bar (145
Ib/In
2
).
Switch off the burner, remove the pressure gauge and
refit the bleed screw.
Commissioning Instructions
FIG. 12
FIG. 13
18
DESN 514825
OIL PRESSURE
ADJUSTMENT
DESN 511997

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alpha 150k

Table of Contents