The detail view shows a tabular summary of the dissipation factor values per phase and per
voltage step. In the case of an MWT measurement the column MTD also shows the
dissipation factor values that were measured in 5 minute intervals during the MWT stage.
 On completion of a measurement you can display in detail view all measured values for
a step or a time interval: For this purpose, in detail view, select a step and press the
rotary knob to confirm.
 For navigating between the measurement results for different phases, turn the rotary
knob.
10.4
Taking a measurement on the next phase or starting the next
measurement stage

10.4.1 The "Split MWT measurement" function is not activated

The measurement ends after the two measurement stages (ramp-up and MWT) have been
carried out on the respective phase. After the measurement, the high voltage is reduced and
the VLF HV generator is discharged internally. This is shown by the message Discharge
process.
When the discharge process is completed, the VLF HV generator changes to the Ready for
operation operating state. The red indicator light goes out, the green indicator light comes
on. The VLF HV generator no longer delivers dangerous voltage. A safety message appears
which prompts you to discharge, earth and short-circuit the test object.
On completion of the measurement you have the following options: